Eastern Regional

Eastern Regional

Eastern Regional Job #:  555 Project Name:  Eastern Regional Reclaimed Water Distribution System, Phase II TransmissionMain Contract 1A Owner:  City of Orlando Final Contract:  $6,143,076 Scope of Work:  Project included the installation of 10,800 LF of 42″ diameter D.I. reclaimed water main pipe/valves/fittings, maintenance of traffic, restoration of existing curb and asphalt pavement, and resodding. Our People make the difference with Pride, Integrity, and Quality PRIME performs heavy construction for municipal projects in the areas of roads, underground utilities and water/wastewater treatment plants. Check our Projects: or To discuss your next...
Bear Lake Road

Bear Lake Road

Bear Lake Road Job #:  559 Project Name:  Bear Lake Road Drainage Improvements Owner:  Seminole County Final Contract:  $2,466,399 Scope of Work:  Provide, labor, materials and equipment to install 5167 LF of RCP pipe from 18″ to 30″, 40 precast structures, 10 manholes, 4677 LF of Type F curb, 2928 SY of 4″ concrete sidewalk, 1,361 SY of 6″ concrete driveway, 11,966 SY of landscape reconstruction, mill 22,662 SY of existing asphalt pavement and resurface with 24,983 SY of friction course (FC 12.5), re-stripe 1.9 miles of roadway, remove and replace 2,300 LF of water main, remove 850 LF of sanitary force main, direction drill 45 LF of 10″ HDPE, completed 10 line stops 10″ and 13 10″ wet taps. Our People make the difference with Pride, Integrity, and Quality PRIME performs heavy construction for municipal projects in the areas of roads, underground utilities and water/wastewater treatment plants. Check our Projects: or To discuss your next...
Winter Park Drive

Winter Park Drive

Winter Park Drive Job #:  566 Project Name:  Winter Park Drive North Realignment Owner: City of Casselberry Final Contract:  $5,661,289 Scope of Work:  Construct approx. 1.5 miles of two lane roadway through an undeveloped ROW along with supporting drainage & utility infrastructure. Work included excavation, embankment, stabilization, base, asphalt, reinforcing steel, lift station, mast arm assembly, signalization, MOT, irrigation. Drainage system included approx. 11,250 lf RCP 24″-42″, 32 inlets and 28 manholes; utilities included approx 2,361 lf 8″ potable water main with 14 service connections, approx 2,334 lf 8″ reclaimed water main with 12 service connections and approx 4,487 lf of 6″-10″ PVC sanitary sewer with 17 manholes and 25 service connections. Our People make the difference with Pride, Integrity, and Quality PRIME performs heavy construction for municipal projects in the areas of roads, underground utilities and water/wastewater treatment plants. Check our Projects: or To discuss your next...
Rock Springs Road

Rock Springs Road

Rock Springs Road Job #:  538 Project Name:  Rock Springs Road Roadway & Utility Improvements Owner:  Orange County Highway Construction Final Contract:  $19,565,973 Scope of Work:  This project consisted of widening 2.1 miles of existing 2 lane roadway to a 4 lane closed drainage, divided roadway including construction of new stormwater drainage and related structures for the entire length. Signalization, masonry wall, handrail, sidewalks and landscaping were included. In addition, PCG constructed new utilities including 12211 lf of sewer force main, 11821 lf reuse water main and 8058 lf potable water main along the project limits for the City of Apopka. Our People make the difference with Pride, Integrity, and Quality PRIME performs heavy construction for municipal projects in the areas of roads, underground utilities and water/wastewater treatment plants. Check our Projects: or To discuss your next...