BP-358 Taxiway Ext
Project Name: Iron Bridge RWRF Master Pump Station Rehabilitation – Design Build
Owner: Greater Orlando Aviation Authority
Final Contract: $3,974,744
Scope of Work: Extension of two airfield taxiways to include approximately 2800 SY of 17″ to 21″ thick portland cement concrete pavement over 6″ leveling concrete, asphalt – lime rock flexible pavement, earthwork, grading, drainage, aircraft rated structures, lighting, guidance signs and pavement markings and misc taxiway shoulder work completed during normal operations of OIA.