Bear Lake Road

Project Name:  Bear Lake Road Drainage Improvements

Owner:  Seminole County

Final Contract:  $2,466,399

Scope of Work:  Provide, labor, materials and equipment to install 5167 LF of RCP pipe from 18″ to 30″, 40 precast structures, 10 manholes, 4677 LF of Type F curb, 2928 SY of 4″ concrete sidewalk, 1,361 SY of 6″ concrete driveway, 11,966 SY of landscape reconstruction, mill 22,662 SY of existing asphalt pavement and resurface with 24,983 SY of friction course (FC 12.5), re-stripe 1.9 miles of roadway, remove and replace 2,300 LF of water main, remove 850 LF of sanitary force main, direction drill 45 LF of 10″ HDPE, completed 10 line stops 10″ and 13 10″ wet taps.

Our People make the difference with Pride, Integrity, and Quality

PRIME performs heavy construction for municipal projects in the areas of roads, underground utilities and water/wastewater treatment plants.

Check our Projects:

Projects Portfolio

or

Call Us

To discuss your next project!