Polisher Unit Improvement Water Treatment Plant 4
Project Name: Polisher Unit Improvement Water Treatment Plant 4
Owner: City of St. Cloud
Final Contract: $1,479,500.00
Scope of Work: Disconnecting and removing the existing aluminum polishing filter units and replacing with new stainless-steel polishing units. Replacing of 2-inch vent pipes with 4-inch ones, replacing air/vacuum relief valves and associated drain piping, and replacing stainless steel piping air vents to the backwash waste drain pipe. Finally, SCADA, electronic backwash water control valve, and differential pressure monitoring and transmitter units.